How do developers partner with designers and manufacturers to enable a faster ROI? How do experienced companies balance accelerated timelines with safety and quality? The finishing process is an important step in completing the pool installation, as it provides the final aesthetic and functional touches to the pool and surrounding area.

Weather and Seasonal Impacts
This alone typically take about a day and a half to get right – assuming there aren’t any other complications that arise. But those rumors are focused around fiberglass pools, which are certainly the quickest type of pool to put in. And before you think you can simply skip the settling period, this can end up costing you a lot more money when you find yourself having to do repairs.
Understanding the Timeline for Pool Construction
- In some cases, it may be possible to move into your new home in as little as six weeks.
- Weather can be a significant factor affecting the construction timeline.
- Larger inground or partially inground Ecopools can take anywhere from 2-4 days to install.
- If you’ve hired a reputable pool builder, this shouldn’t be the case though.
- The pool shell will be carefully placed in the excavated hole, and any necessary adjustments will be made to ensure it is level and secure.
- A planning permit may be required and this can take up to six weeks.
Numerous funding options are available, with construction loans at a 5-8% recommended low interest rate. The duration can vary, primarily influenced by the home's size and potential construction delays. This faster process makes it a popular choice for those looking to enjoy a pool with minimal wait time.
How Long Does it Take to Build a Pool - Frequently Asked Questions
A simple 8’x20’ container pool can be ready to ship in as little as 20 days. By reducing construction time, modular methods help you meet deadlines, control costs, and bring your project to life faster. The speed of modular construction is a game-changer in the industry, providing a significant advantage over traditional building methods. By constructing building modules in a factory-controlled environment and then assembling them on-site, modular construction drastically reduces project timelines. Modular building construction involves creating prefabricated sections, or modules, in our manufacturing unit before transporting them to the construction site for assembly. This method reduces on-site construction time, minimizes waste, and often results in a higher quality product due to controlled manufacturing conditions.
Can Modular Homes Withstand Extreme Weather?
- If you’re adding extras like landscape lighting, an outdoor kitchen, or custom irrigation, that’ll extend the timeline a bit.
- The pool shell will be made of durable materials, such as fiberglass or concrete, and will be designed to withstand the weight and pressure of the water.
- The main advantage of modular homes is their faster build time, without any compromise in quality.
While the factory begins module construction, your property is graded, utilities are brought to the site, and foundations are poured. For a more concise list, see our breakdown of the best modular home builders HERE. The main difference between the two is that the modules/pieces of a modular home are made off-site, transported and then secured to a foundation on site. MBI is committed to removing industry barriers & fostering the growth and expansion of commercial modular construction. For Quick Installation Solutions: Meeting the Growing Demand for Therapy Pools about building a pool, explore the pool section of our Learning Library.
Size and Features

Being organized and prepared can shorten the time required for installation. Make sure to gather the necessary materials and schedule adequate time for each step to ensure a smooth and successful pool liner installation. With the ability to add baja ledges, stairs, benches, and even windows, every Ecopool is custom-made by hand in Salado, Texas. Utilizing an polymer membrane, an 8-layer design, and being able to be configured in unlimited sizes, Ecopool is at a distinct advantage over other modular pool builders. Your pool builder will need to get engineer plans and working drawings which are then submitted to the council for building approval. However, hiring professionals can make the process smoother and save time, especially if you’re unsure about the installation steps or have a custom liner. Following this guide will help streamline the installation process and ensure a successful outcome. Rain or extreme temperatures may hinder outdoor work, causing delays. Ideal weather conditions—mild and dry—promote smoother and faster installations. Always check the forecast before starting to ensure optimal conditions for your project.
Connecting the Equipment
You’ll usually need permits for excavation, plumbing, and electrical work, and sometimes even fencing or safety gates, depending on your local codes. Every city or county is different, so it’s important to know what’s required ahead of time. The construction of a concrete pool typically involves multiple stages, including excavation, forming, steelwork, plumbing, electrical work, and final finishing touches. The complexity of the design, size of the pool, and the expertise of the construction team can influence the duration of each stage. In the process of building a swimming pool, one crucial phase is site preparation and excavation. This involves various tasks, such as groundwork, grading, and excavation, that are necessary to prepare the area for pool installation.
Why More Homebuyers Are Choosing Modular Homes
Because they all have different factors and materials, some require them to be made on-site, while others are manufactured already. In recent years, modular homes have become a popular choice for those in search of a new home. These homes are built in sections or modules in a factory and then transported to the site where they are assembled.
Plaster Addition Time Frame
The plumbing lines will be connected to the pool shell, and any necessary valves and fittings will be installed. This phase also includes applying the final finishes to the pool, like plaster for gunite pools or the installation of a vinyl liner. Inground pool installation can take anywhere from a week to three weeks, depending on the type of pool you’re putting in and the weather conditions. This can take 1 – 4 weeks and involves designing the pool according to your preferences and creating a 3D model of it for visualization. Apply a finish to the pool surface, such as plaster or aggregate, and install any coping stones or tile. The construction team will also test the pool systems to ensure they are working properly. The finished cost is the most crucial, accounting for all essential elements. Base model costs range from $120,000-$150,000, but finished costs are around $270,000-$300,000, including extras.
Q. What time of year is it cheapest to build a pool?
By the end, you’ll have a clearer idea of what to expect and how to make your pool project a smooth and enjoyable experience. At this stage, you'll finalize the floor plans and make key decisions regarding your home's interior and exterior designs. Whether adjustable depth therapy pools with bolted panel design opt for a standard design or a fully customized layout, the choices made here will define the rest of the construction process. Securing financing and obtaining the necessary building permits are also crucial during this period, as any delays in paperwork can extend the timeline.